07733 823920mario@herunetworks.co.ukLooking for work?See jobs →

Structured cabling · Fibre · Testing

Your network.Our expertise.

We install, splice, test and document the copper and fibre that data centres and commercial buildings run on. Dressed neatly, certified properly and handed over with the paperwork done.

  • Delivery partner
  • Labour supply
  • Safety-led
  • Evidence-led handover

Our work

Neat is a standard, not a bonus

Every cable has a start, an end and a test result. We look after all three, and it shows. Tap a photo to see it full size.

Ways to work with us

Pick how we fit your project

Hand us the whole package, add our people to your teams, or both, with safety and evidence managed alongside.

We run it

Delivery partner

We take your cabling package: our plan, our engineers, our checks, handed over to programme.

You run it

Supply partner

Carded copper and fibre engineers, testers and supervisors placed into your teams.

Both

Delivery and supply

We run defined areas ourselves and add people to support your teams elsewhere on site.

Safety

Safety-led

Briefed, carded operatives, daily toolbox talks and safe working on our scope.

Proof

Evidence-led

Installed to the agreed specification, with test results, labels and records to prove it.

Why it matters

Errors found late are the most expensive to fix

When faults stay hidden until testing or handover, the result is re-pulls, re-terminations, delays and lost margin. We plan first, check as we go and test everything.

Self-certified installsProblems go unreported until test day.
Late reworkRe-pulls and re-terminations eat the programme.
Missing paperworkHandover stalls while records are rebuilt.

Try it

How ready is your handover?

Tick what your last cabling handover actually included. Anything missing is a gap your client, QA team or the next engineer will find later.

On our jobs, every box is ticked as standard.

See an example pack
0/ 100

Handover readiness

Self-check. Nothing you tick is sent anywhere.

Tick the boxes to see your score.

How we work

The life of a link

From bare containment to a certified, labelled link in six steps. See how we work →

  1. 01

    Survey

    Walk the site, read the drawings, agree the scope.

  2. 02

    Plan

    Schedules, panel layouts and loom order set out.

  3. 03

    Install

    Containment, pulling and dressing, done neatly.

  4. 04

    Terminate

    Copper terminated, fibre fusion-spliced.

  5. 05

    Test

    Every link certified, faults fixed and retested.

  6. 06

    Hand over

    Labels, results and photos in one evidence pack.

Tested with

Proper kit, proper results

We own and use our own test and splicing equipment, so results don't depend on borrowed kit.

Fluke Networks DSX-8000

Copper certification with a pass or fail report for every link against the specified standard.

CertiFiber Pro quad module

Fibre loss testing on single-mode and multimode links, reported alongside the copper results.

Fujikura fusion splicing

Low-loss fusion splices on single-mode and ribbon fibre, protected and managed in the tray.

Where we work

Experience across live environments

We put engineers on your job who already know how that kind of site works: its permits, its access rules and its paperwork.

Engineers who know the siteInductions, permits and ways of working are familiar before day one.
The right specialistCopper, fibre and test people matched to the work in front of them.
Fewer surprisesProblems are spotted early and solved quickly.

Scale

Big jobs don't scare us

A few numbers from projects our director has worked on. See the projects →

1,400

Cat6A cables on one research facility install

1,048

fibre cores ribbon-spliced in one data centre

300+

cabinets on one colocation project

500+

fibre splices in three days at telephone exchanges

Curved run of blue cable looms under a raised floor

Training

Building the next generation of cabling engineers

The way someone starts in this trade is how they carry on. Learn from someone who cuts corners and you will cut corners. Learn from someone who takes pride in the finish and you will too.

We help run a year-round trainee course for new data cabling engineers, teaching the same standards we work to: plan first, dress it neatly, test everything, record it properly.

Ask about training

Main contractor? We slot straight in.

Carded engineers, supervisors and project managers, working to your programme, your RAMS and your site rules.

Work with us
Bundled copper cables under a raised floor

Engineers and technicians

Looking for work?

Copper engineers, fibre splicers, testers and supervisors: see our open jobs, sign up for job alerts, or send your CV.

Questions

Asked often

All questions → · Cable guide →

Do you work as a subcontractor to main contractors?

Yes. We supply engineers, supervisors or a complete cabling package, and work to your programme, site rules and RAMS.

What do we get at handover?

Test reports for every link, a label schedule that matches the drawings, outlet and panel records, and photos of the finished installation, all in one pack.

Cat6, Cat6A or fibre?

It depends on distance, speed and your specification. Our cable guide gives a quick answer, and we confirm at survey.

Got a job coming up?

Answer a few quick questions and we'll come back with a price and a plan.