What's included
InstallationCable pulled through containment, dressed into looms and kept to bend and fill limits.
TerminationPatch panels, outlets and consolidation points, terminated and dressed to a clean finish.
Moves, adds and changesNew outlets, extensions and re-terminations in live, occupied spaces.
Fault finding and repairsFailed links traced, repaired or replaced, then retested.
How we do it
- We agree the cable schedule, panel layout and loom order before work starts.
- Cables are labelled at both ends as they are pulled, not at the end of the job.
- Every link is certified on a Fluke Networks DSX-8000 against the standard in your specification.
- Failures are fixed and retested before the results are handed over.
What you get
A tidy, labelled installation and a handover pack with a test report for every link, a label schedule that matches the drawings, and photos of the finished panels and outlets.
Common questions
Cat6 or Cat6A?
It depends on the speeds the network needs now and later, distances and the client's specification. We install whichever is specified and can talk through the options at survey.
Can you work around staff in an occupied building?
Yes. We plan noisy and disruptive work around the building's needs, including out-of-hours working where agreed.
Do you only test new work?
No. We can test existing cabling to find faults or to give you a baseline before changes are made.