The same method on every job, whether it's twelve outlets or a full data hall. Here's what happens and what you get.
We walk the site, check containment and access, read the drawings and agree the scope and programme.
Cable schedule, panel and port allocation, loom order and lengths set out before install.
Cables pulled, labelled at both ends as they go, and dressed neatly into looms.
Copper terminated into panels and outlets; fibre fusion-spliced and managed in trays.
Every link certified. Failures are fixed and retested before anything is handed over.
One evidence pack: reports, label schedule, records and photos.
Evidence-led handover
Everything your client, your QA team or the next engineer needs to trust the installation.
A certification result for every copper and fibre link, saved under its label ID.
Every cable, its two ends and its label, matching the drawings.
Which outlet lands on which panel and port, room by room.
Finished panels, cabinets, outlets and containment, for your records.
| Link | Type | Length | Result |
|---|---|---|---|
| A-01-001 | Cat6A | 42.3 m | PASS |
| A-01-002 | Cat6A | 44.8 m | PASS |
| A-01-003 | Cat6A | 39.1 m | PASS |
| F-01-01 | OS2 | 118.0 m | PASS |
| Label | Outlet | Panel / port | Room |
|---|---|---|---|
| A-01-001 | 2.14-A | PP-A / 01 | Office 2.14 |
| A-01-002 | 2.14-B | PP-A / 02 | Office 2.14 |
| A-01-003 | 2.15-A | PP-A / 03 | Meeting 2.15 |
| A-01-004 | 2.15-B | PP-A / 04 | Meeting 2.15 |
On site
Inductions, permits, RAMS and daily toolbox talks. Our director holds SSSTS and IPAF.
Neat looms, clean cabinets and a clear work area at the end of every shift.
Clear progress updates and early warning of anything that could affect the programme.